Goltens Green Technologies

Ship Repair, Design and Engineering Services

Proven Ballast Water System Retrofit Services for Tankers

Goltens Green Technologies

The German ship owner and manager Ernst Jacob approached Goltens Green Technologies in Groningen to perform detailed engineering for a 1,000m³/h NK-O3 Blue Ballast System retrofit for four of its 76,000dwt product tankers.

This was another perfect opportunity for Goltens Green Technologies to demonstrate the power and efficiency of its global capability.

3D Scanning in Singapore

The project was to start with the Konstantin and Georg Jacob. As both vessels were to make scheduled stops at the Singapore anchorage, Goltens Green Technologies in The Netherlands arranged for Goltens Green in Singapore to complete the ship check and 3D Laser scanning. The Konstantin Jacob was scanned in December 2015, the Georg Jacob was scanned in April of 2016.

Download to find out more.