| Acergy Viking, Inspection, Maintenance and Repair Ship | ||
The ship at sea under operations. |
The helicopter deck. |
The ship is powered by a diesel electric system. |
The main generator diesel engines are four PI 8M25. |
The marine diesel generator engines. |
|
| Anasuria - | ||
Anasuria is the first purpose-built floating production storage and offloading (FPSO) vessel. |
Anasuria topsides. |
Anasuria incorporates Hydralift's ram luffing crane with box boom. |
The swivel stack being placed into position. |
Anasuria is the world's largest newhull tanker-based FPSO. |
The process pipework. |
Anasuria's offloading facilities. |
||
| Bonga - | ||
The Bonga FPSO hull arriving at Tyneside for the process topsides to be installed. |
The Bonga FPSO was built by Samsung Heavy Industries in Korea and sailed to Tyneside. |
The vessel's power is derived from two diesel driven alternators, each with a capacity of 1,900kW at 1,000rpm. |
The processing equipment installed will be able to process 225,000 barrels of crude oil per day at a maximum tank temperature of 60°C. |
The Bonga FPSO ready for topsides outfitting. |
|
| Chikyu - Drillship | ||
The Chikyu is a scientific drillship that can drill 7000m below the sea bed. |
The drilling derrick. |
A diagram of how the Chikyu drilling system works. |
The pipe racks of the drillship. |
The Chikyu is undergoing several tests before it can be put into service in 2007. |
The electric hydraulic knuckle boom crane loads and unloads stores from the support vessel. |
A view of the drillship looking towards the bow. |
||
| Deep Blue - | ||
Delivery of the CSO Deep Blue in March 2001. |
Deep Blue's sailing bridge. |
Deep Blue's operations bridge. |
CSO Deep Blue towed in Ulsan Harbour, Korea, August 2000. |
CSO Deep Blue before the installation of her pipelay system, March 2001. |
Artists impression of the CSO Deep Blue. |
Side elevation of the CSO Deep Blue. |
Naming ceremony. |
|
| Discoverer Enterprise - | ||
Discoverer Enterprise was built at Astano, Izar's offshore construction yard in northern Spain. |
Bow erection of the Discoverer Enterprise. |
Discoverer Enterprise's knuckle boom deck cranes able to handle drilling pipes 4X80t @ 15m. |
The launching and floatout operation of Discoverer Enterprise prior to sailing for final fabrication in Mexico. |
Discoverer Enterprise as delivered by Astano ready for installation of the dual derrick systems. |
Final stage of the installation of the dual derrick systems in the Gulf of Mexico. |
| Edda Fauna - Maintenance Vessel | ||
The Edda Fauna has state-of-the-art systems for IMR operations. |
The Edda Fauna was designed by Skipstecknisk AS. |
The ship has been chartered for deep ocean operations for StatoilHydro. |
The Edda Fauna was delivered in early 2008. |
The Edda Fauna has been designed for tasks requiring excellent manoeuvrability. |
|
| Far Seeker - Supply Ship | ||
The Far Seeker is the latest addition to the Farstad fleet. |
The ship is a supply vessel which will service off-shore platforms. |
The ship was delivered in early 2008. |
The Far Seeker has now started a contract with StatoilHydro. |
||
| FLIP - Research Vessel | ||
FLIP during the 28 minute flipping process, caught halfway between its horizontal and vertical position. |
FLIP once the transformation has taken place, 300m of the buoy are underwater and the protruding part is as tall as a five-storey building. |
FLIP before the transformation begins. |
FLIP ship inventors Dr Fred Spiess and Dr Fred Fisher relax onboard the buoy. |
||
| GMS Endurance - Jack-Up Barge | ||
The Endurance will be used for offshore construction. |
GMS is hoping to win exploration activities contacts for the southern gas basin of the North Sea. |
The Endurance will also be used for offshore construction and in the wind power installation market. |
| Island Constructor - Well Intervention Vessel | ||
The bow shape of the Ulstein design allows the vessel to maintain speed while saving fuel. |
Ulstein Design will deliver 20 Ulstein X-Bow vessel designs to seven ship owners between 2008 and 2010. |
The inverted bow means vessels with this feature have exceptionally soft entry into oncoming waves. |
The SX121 design can be configured for search and rescue vessels. |
The deck and helipad of the Island Constructor. |
|
| MST Navion Munin - | ||
Navion Munin is the second MST(Multipurpose Shuttle Tanker) vessel in service. |
The Navion Munin cargo tank section consists of 18 cargo tanks plus two slop tanks, giving a total cargo capacity of 101,400m³. |
Navion Munin is moored using the submerged turret system that was originally designed for shuttle tanker loading. |
The production on-board Navion Munin is designed to process the wide range of oil and water rates, and all facilities are designed to operate under severe metocean conditions. |
Navion Munin has been operating offshore China on the Lufeng field. |
|
| Normand Pioneer - | ||
The Normand Pioneer represents a pioneering design combining a wide range of capabilities. |
The working deck area is almost 1,000m² and can carry approx. 3,500t. |
The vessel’s winch can pull 500t and has a capacity for 1,500m of 109mm wire. |
Normand Pioneer is powered by one eight-cylinder and one six-cylinder Wärtsilä SW38 engine. |
Normand Pioneer’s service speed is a respectable 12 knots. |
|
| Ramform Banff - | ||
The Ramform Banff production vessel hull was fabricated at the Hyundai Mipo yard in Ulsan, South Korea. |
The fully weather vaning turret mooring can accommodate up to 15 risers, although Banff will use only seven. |
The Ramform Banff is a novel Floating Production, Storage and Offtake (FPSO) system. |
The Ramform Banff process systems. |
The hull, which has a characteristic delta shape, provides both a large load bearing capacity (up to 16,000t) and a stable work platform. |
The vessel is powered by two 3,530kW fresh water-cooled diesel generator sets. |
This octagonal steel helicopter deck measures 22.2m by 22.2m and is suitable for EH101-type helicopters. |
||
| Searose - | ||
The Searose FPSO will be used in the development of the White Rose oil field. |
The topsides of the Searose will process all incoming well fluids from the reservoir and produce crude oil for cargo, gas for fuel and re-injection back into the reservoir, and oil-free water to discharge to sea. |
The vessel is based on a Samsung shuttle tanker hull form modified to serve as an FPSO. |
Part of the import system for the Searose FPSO. |
The main engines area a pair of Wartsila 8L46B units with an output of 7,800kW at 500rpm. |
|
| SPS Torrent - Supply Vessel | ||
The SBS Torrent under construction. |
The cargo decks of the SBS Torrent have been designed to avoid accidents. |
The SBS Torrent was delivered in April 2008. |
The SBS Torrent is now on long-term charter in India. |
The ship has a 'well deck' cargo area. |
|
| STX Europe Platform Supply Vessel | ||
A rendering of the unamned platform supply vessel. |
The vessel's design was developed under STX Europe’s Ecorizon Programme. |
The ship's equipment will be manufactured by STX Europe's electro subsidiary. |
| Thor Alpha - Marine Support Vessel | ||
The Thor Alpha was constructed in the Faroe Islands. |
The Thor Alpha is operating under a medium-term charter to Fugro. |
The Thor Alpha can act in a multi-purpose role in the oil industry. |
There is accommodation for ten passengers, with sleeping seats for 34. |
The construction contract has boosted the ship building industry in the Faroe Islands. |
|