WinGD introduces high-pressure LNG engine for container shipping sector
The X-DF-HP engine will be offered in X82 and X92 bore sizes, with deliveries anticipated to start in 2028.
The X-DF-HP engine will be offered in X82 and X92 bore sizes, with deliveries anticipated to start in 2028.